mvp development company
MVP development for startups & new products — ruthless scoping, 10–14 week builds, billing included at launch. Validate with paying customers, not promises.
Building a SaaS product is two problems wearing one budget: build the right thing (product risk) and build it right enough (engineering risk). Overspend on the second before validating the first and you run out of runway; ignore the second entirely and your first enterprise customer's security review kills the deal. The process below is designed around that tension. Shortcut: book a scoping call and we'll tell you which risk you're currently carrying.
SaaS MVPs — the smallest product a customer will pay for, shipped in 12–16 weeks. Scope discipline is the deliverable; see MVP development.
Full SaaS platforms — multi-tenant products with roles, billing, admin, integrations, and API — built for the security questionnaires your future enterprise buyers will send.
AI-native SaaS — products where LLM features are the value prop, with the cost-per-tenant engineering that makes AI margins survivable.
SaaS rescues & re-platforms — inheriting a product from a previous team, stabilizing it, and rebuilding what can't be saved.
Enterprise-readiness upgrades — SSO/SAML, audit logs, RBAC, SOC 2 controls, uptime SLAs: the checklist that unlocks five-figure contracts.
These four choices are cheap on day one and brutally expensive to reverse at 200 customers:
Product scoping (1–2 weeks). We compress your vision to the smallest sellable slice — feature map, user flows, pricing hypothesis, fixed quote. The most valuable sentence in this phase is usually "cut that."
Design sprint. Clickable prototype; test it on 5 target users before code. Cheapest pivot you'll ever make.
Build (8–12 weeks). Two-week sprints, staging URL from week two, billing and onboarding built alongside features — because "we'll add payments later" means later never has revenue.
Launch. Production hardening, monitoring, status page, and the analytics dashboard that tells you what users actually do.
Iterate to PMF. Post-launch, we run 2-week improvement cycles against activation and retention data — the roadmap argues with evidence, not opinions.
For products past PMF: performance engineering (the query that was fine at 50 tenants and is timing out at 500), reliability (SLOs, on-call, incident process), enterprise features (SSO, audit logs, data residency), SOC 2 readiness, and team augmentation that works inside your existing codebase and rituals rather than around them.
We scope against runway. Your quote comes with a "what ships by which date for which dollars" table — and we'll tell you when your scope exceeds your runway before you sign.
You own the product. Code, infra, data, docs — in your accounts from day one. If you raise a round and hire in-house, the handover package is already written.
Enterprise-grade by default. OWASP-aligned builds, tenant isolation testing, and the security documentation your first big customer's procurement team will demand.
AI margin math. For AI-native products we model per-tenant token cost against your pricing before you commit to a feature — AI cost engineering →.
Full driver breakdown: SaaS development cost guide.
A sellable MVP: $50K–$120K. Growth build-out: $100K–$300K. The honest variable is scope discipline — every "just one more feature" before launch costs money and delays the learning that tells you if the feature mattered.
| Decision | Our default | Why it matters |
|---|---|---|
Tenancy model | Shared database, tenant-scoped rows (pooled) — with an isolation path for enterprise tiers | Wrong tenancy choice is the #1 cause of SaaS rewrites; full analysis → |
Billing | Stripe Billing integrated day one — trials, upgrades, dunning, tax | Retrofitting billing into a "free beta" product is weeks of pain; subscription billing guide → |
Auth & roles | Standards-based auth with org/workspace model and RBAC from the start | "Add teams later" is a schema migration nightmare |
Instrumentation | Product analytics + activation/retention events wired before launch | You can't iterate toward PMF on data you didn't collect |
| Stage | Range | Includes |
|---|---|---|
| SaaS MVP | $50K – $120K | Core product, billing, onboarding, admin, analytics — sellable v1 |
| Growth-stage build-out | $100K – $300K | Integrations, API, enterprise auth, performance, mobile |
| Ongoing product team | $25K – $80K/mo | Dedicated squad (eng + design + QA) you direct |
12–16 weeks for a disciplined MVP, including billing. If a plan doesn't include payments at launch, it's a demo plan, not a product plan.
Yes — as an embedded team extension. We start with a code review, agree on standards, and work in your repos and rituals.
Default: Next.js + Node.js or Python + PostgreSQL on AWS, Stripe for billing — mainstream, fast, fundable, hireable. Deviations come with written justification.
Either we run improvement cycles with you toward PMF, or we hand over cleanly to your in-house hires — documentation, architecture walkthroughs, and 90-day transition support are part of the package.
Yes — controls, logging, access management, and the evidence trail auditors need. SOC 2 roadmap →
Let's discuss how we can help you with saas development company.
MVP development for startups & new products — ruthless scoping, 10–14 week builds, billing included at launch. Validate with paying customers, not promises.
Software product development from idea to scale — strategy, design, engineering & iteration under one roof. For founders and product teams building to last.
Web application development for US businesses — portals, dashboards, SaaS & internal tools built with React, Node.js and Python. Fixed quotes in 24 hours.
AI application development for US businesses — AI agents, RAG search, document automation & LLM features built into real products. Free AI-readiness call.